References

Client: voestalpine Stahl GmbH, Donawitz

Projectdescription

Establishment of a steam boiler plant with a steam turbine for the production of process steam and electricity from metallurgical gases.

Pel=72MW; 230to Dampf/h

EMSR-Project management: Customer support in the implementation of the project on the EMSR site after targets and goals of the client.

Tasks

Basic Engineering, authorities submission, bidding, procurement, project management, site supervision, scheduling, cost controlling

Period: 09/2006 to 01/2009

Capacity: € 500.000

Country: Austria

Projectdescription

Establishment of a cooling water pump with 4 main pumps each 1.5 MWel and 2 pcs back Francis water turbines to supply the locations of cooling water.

Cooling water = 24.000m³
Return water = 30.000m³.
Pel = 2 x 2MW

EMSR-Project management: Customer support in the implementation of the project on the EMSR site after targets and goals of the client.

Tasks

Basic Engineering, authorities submission, bidding, procurement, project management, site supervision, scheduling, cost controlling

Period: 01/2007 to 11/2008

Capacity: € 200.000

Country: Austria

Projectdescription

Renovation / modernization of a plant consisting of 3 turbines, feed water, hot water supply, heat extraction.

Leistungen: Pel=6MW, Pel=11MW and Pel=17MW and building a 25MW steam turbine.

EMSR-Project management: Customer support in the implementation of the project on the EMSR site after targets and goals of the client.

Tasks

Basicengineering, Behördeneinreichung, Ausschreibung, Vergaben, Projektabwicklung, Baustellenüberwachung, Terminplanung, Kostencontrolling

Period: 01/2007 to 11/2008

Capacity: € 150.000

Country: Austria